KTM ELECTRIFIED DOUBLE TRACKING – RAWANG TO IPOH
HSS was engaged as the project management consultant responsible for overseeing the design, construction and the electrification of the double-tracking of 178km of existing railway line between Rawang and Ipoh. It included 400 kilometres of railway track, 18 stations and halts, 78 railway bridges, 20 road-over-rail bridges and 300 culverts.