11KV AND 33KV SUB–STATIONS AND VESSEL SUPPLY
AT CT9

Based on a plan to extend the container terminal (CT) up to CT9, there was a requirement to take bulk electricity supply at 33kV from TNB’s network for power supply to the entire development area. The works comprised the 33kV main distribution and 11kV sub-station, 33kV supply using two 30MVA step-down power transformers, and mains to fifteen 11/0.433kV distribution sub-stations feeding the container crane and other power systems. Work also encompassed the external telephone systems, manhole ducting, a SCADA System, a vessel supply system, fire hydrants and the cold water reticulation system. HSS was appointed to provide electrical engineering design inputs covering the provision of cost estimates, the preparation of tender documentation, tender evaluation, and liaison with authorities to secure approvals for construction.

01

Client

Westports Malaysia Sdn Bhd

03

Duration

2004 — 2017

02

Our Service

Construction Supervision

04

Location

Selangor, Malaysia

Scope Of Work

Provision of cost estimates

Preparation of Tender Documentation, Tender Exercise

Liaison with authorities on approvals for construction of sub-stations, 33kV Main Distribution and 11kV sub-station.

Provide design on 33kV supply, using 2 nos. 30MVA power transformer, step down and distribute to 15 numbers of 11/0.433kV distribution sub-stations at Container Crane system and LV systems.

Design of external Telephone Distribution systems, man-hole ducting, SCADA System, Vessel Supply system, Hydrant and cold water reticulation system.