DISTRIBUTION PARK COMPLEX, NORTH PORT, PORT KLANG – CONSTRUCTION OF SINGLE STOREY WAREHOUSE
This was the first warehouse built in the Port Klang Distribution Park complex where foundation design posed challenges owing to marine clay. The warehouse is 90m (width) x 156m (long) with a two storey office. The Portal Frames are spaced at 12m c/c with two intermediate column spanning 30m. The ground floor has been designed to support an imposed load of 50kN/m2 and was raised up by 1.22m to facilitate the container loading/unloading activities.
Client
Port Klang Distribution Park
Duration
1996 — 1997
Our Service
Engineering Design & M&E
Location
Selangor, Malaysia
Scope Of Work
Architectural
Civil
Structural
Mechanical
Electrical Works






