KELANG PORT MANAGEMENT DOCKYARD, SLIPWAY NO. 4
This project involved the upgrading of wharf side slipway to cater for higher loads. The slipway was upgraded from 150 tonnes to 250 tonnes for more efficient and cost effective service. The services provided by HSS included preliminary design, detailed structural design and economic evaluation of engineering option.
Client
Kelang Port Management
Duration
1994 — 1995
Our Service
Engineering Design
Location
Selangor, Malaysia
Scope Of Work
Preliminary Design
Detailed Structural Design
Economic evaluation of engineering option