KELANG PORT MANAGEMENT DOCKYARD, SLIPWAY NO. 4

This project involved the upgrading of wharf side slipway to cater for higher loads. The slipway was upgraded from 150 tonnes to 250 tonnes for more efficient and cost effective service. The services provided by HSS included preliminary design, detailed structural design and economic evaluation of engineering option.

01

Client

Kelang Port Management

03

Duration

1994 — 1995

02

Our Service

Engineering Design

04

Location

Selangor, Malaysia

Scope Of Work

Preliminary Design

Detailed Structural Design

Economic evaluation of engineering option

img-04
× How can I help you?