VISUAL CONDITION SURVEY OF PENANG PORT

As a pre-cursor to upgrading the port, MMC Corporation Berhad engaged HSS to undertake condition survey of wharf structure at North Butterworth Container Terminal at Penang Port. HSS’s initial work comprised a desk study based on existing as-built drawings and other previous inspection reports received from Penang port. Subsequently, HSS undertook visual inspection and rated defects identified in the wharf structure in accordance with the REAM-GL 5/2004 guidelines. The structural elements assessed included the deck slab, quay wall (partial), fenders, bollards, crane rails, buffer stops, ladders, expansion joints, surfacing, reinforced concrete kerb and drain pipes. The work culminated in the preparation of a technical ‘due diligence’ report with Professional Engineers endorsement.

01

Client

MMC Corporation Berhad

03

Duration

2016

02

Our Service

Engineering Design

04

Location

Selangor, Malaysia

Scope Of Work

To conduct wharf desk study based on existing as-built drawings and other previous inspection reports received from Penang port.

To undertake visual inspection and rating of defects with reference to REAM-GL 5/2004 guidelines of the wharf from top of the wharf structure. This covers elements such as deck slab, quay wall (partial), fenders, bollards, Crane rails, buffer stops, ladders, expansion joints, surfacing, R.C. kerb and drain pipe.

To collect photographs and notes and prepare pictorial reports.

To collect data and prepare summary reports.

Submission of Technical due diligence report with PE endorsement to client