PROPOSED MAJU EXPRESSWAY EXTENSION TO KLIA (MEX 2)

The Maju Expressway Extension or MEX 2 comprises a 16km long highway from Putrajaya to KLIA Expressway. This stretch was part of the original Concession Agreement that was deferred due to the Financial Crisis of 1998. It was designed to provide the shortest route to both the Kuala Lumpur city center and the Putrajaya region with a direct connection to Kuala Lumpur International Airport (KLIA) and KLIA2. The route begins at the Putrajaya Interchange and merges onto the FT26 (existing Lebuhraya KLIA) in Sepang.

HSS was engaged to design the expressway works, including the interchange at Putrajaya, a toll plaza and a supervision building. HSS also undertook construction supervision.

01

Client

Maju Expressway

Sdn Bhd

03

Duration

2010 - Ongoing

02

Our Service

Engineering Design & Construction Supervision

04

Location

Selangor, Malaysia

Scope Of Work

Prepare Preliminary Engineering Design of Civil and Structural works

Prepare Detailed Engineering Design of Civil and Structural works

Prepare Bill of Quantities

Prepare Design Brief for onward submission to LLM

Construction Supervision

Picture9
deneme bonusu veren sitelerdeneme bonusubonus veren sitelerdeneme bonus siteleriporn
× How can I help you?