EAST COAST EXPRESSWAY (PHASE 1) PACKAGE 1C1 AND 1D1

Packages 1C1 and 1D1 are a dual two-lane carriageway with the approximate length of 13 km and 9.5 km respectively, starting just after the Temerloh town. The project is part of the East Coast Expressway Phase 1 from Karak to the border of Pahang/ Terengganu. The project consists of two river bridges, one overhead bridge crossing the FR83, one pair of Rest and Service Area, one Weighbridge Station, one interchange at Chenor and twelve Vehicular Box Culvert

01

Client

Terratech Consultants

Sdn Bhd

03

Duration

2000 - 2003

02

Our Service

Engineering Design & Construction Supervision

04

Location

Pahang, Malaysia

Scope Of Work

Detailed Design for mainline, interchange, junction and all associated roadways

Services and public utilities relocation

Road furniture, road markings and signages

Drainage and vehicular box culvert

Ground treatment and slope stabilisation

Platform for toll plaza, lay by, rest and service area, weighbridge station