EAST COAST EXPRESSWAY PHASE 2 (PACKAGE 7-12)
The East Coast Expressway Phase 2 is 174km long and located in Terengganu State. 70% or 110km is implemented by JKR while the remaining 30% or 64km by LLM. JKR appointed Terratech Consultants to carry out the task for 50km length. Work scope includes preliminary alignment study, drainage, hydrology, geotechnical and preliminary cost estimates.