NSE CENTRAL LINK, PUTRAJAYA LINK - 3D, DESIGN & SUPERVISION

The North South Expressway Central Link (NSECL) – Putrajaya Link is a dual two-lane carriageway extending from the existing NSECL for an uninterrupted access to Putrajaya, the new Federal Government Administration township, located about 30km south of Kuala Lumpur.

The length of the NSECL-Putrajaya Link is approximately 9km. The project involved the construction of one trumpet interchange at NSECL and a toll plaza for the closed toll system which is fully integrated with the system operated by PLUS & ELITE on the NSE & NSECL. Due to the weak sub-strata, extensive ground treatment was used along the entire alignment.

01

Client

Expressway Lingkaran Tengah Sdn Bhd (ELITE)

03

Duration

1997 - 2000

02

Our Service

Engineering Design & Construction Supervision

04

Location

Selangor, Malaysia

Scope Of Work

Alignment design for expressway mainline and interchanges

Ground treatment designs

Bridges and viaducts

Hydrological & hydraulic analysis of catchment areas and drainage designs

Toll Plaza designs