MUAR RIVER FLOOD MITIGATION WORKS

HSS was engaged to prepare a master plan for flood mitigation works in the 6,300 square kilometer Sungai Muar River Basin. As part of the work, HSS undertook a range of hydrological and hydraulic studies, including mathematical modelling, to test the performance of the various identified flood mitigation options. Evaluations led to the identification of a package of priority flood mitigation works for implementation in Segamat and the Lower Sg Muar.

01

Client

Drainage & Irrigation Department, Malaysia

03

Duration

2009 — 2011

02

Our Service

Engineering Design & Environmental Services

04

Location

Johor, Malaysia

Scope Of Work

HSS prepared master plan recommendations and detailed engineering designs for the priority flood mitigation works.