KOTA TINGGI – RIVER PROTECTION AND LANDSCAPING
The project entailed the preparation of detailed engineering designs for bank protection works, recreational facilities and landscaping works for a 1.2km long section of the banks of the Sungai Johor at Kota Tinggi. HSS’s services included investigation and analysis of the causes of river bank erosion in the affected areas. Commencing with the formulation of conceptual designs of river bank protections works deemed necessary to mitigate erosion problem, HSS also prepared detailed designs for all of the river bank protection works components, including outlet structures and associated works, landscaping works and recreational facilities.