KOTA TINGGI – RIVER PROTECTION AND LANDSCAPING

The project entailed the preparation of detailed engineering designs for bank protection works, recreational facilities and landscaping works for a 1.2km long section of the banks of the Sungai Johor at Kota Tinggi. HSS’s services included investigation and analysis of the causes of river bank erosion in the affected areas. Commencing with the formulation of conceptual designs of river bank protections works deemed necessary to mitigate erosion problem, HSS also prepared detailed designs for all of the river bank protection works components, including outlet structures and associated works, landscaping works and recreational facilities.

01

Client

Drainage & Irrigation Department

03

Duration

1997 — 1998

02

Our Service

Engineering Design & Environmental Services

04

Location

Johor , Malaysia

Scope Of Work

Investigation and analysis for the cause of river bank erosion of the effected areas

Formulate conceptual designs of river bank protections works deemed necessary to mitigate erosion problem

Detailed design of river bank protection works

Detailed design of all outlet structures and associated works

Detailed design of landscaping works and recreational facilities

Picture3A
× How can I help you?