KOTA TINGGI – RIVER PROTECTION AND LANDSCAPING
The project entailed the preparation of detailed engineering designs for bank protection works, recreational facilities and landscaping works for a 1.2km long section of the banks of the Sungai Johor at Kota Tinggi. HSS’s services included investigation and analysis of the causes of river bank erosion in the affected areas. Commencing with the formulation of conceptual designs of river bank protections works deemed necessary to mitigate erosion problem, HSS also prepared detailed designs for all of the river bank protection works components, including outlet structures and associated works, landscaping works and recreational facilities.
Client
Drainage & Irrigation Department
Duration
1997 — 1998
Our Service
Engineering Design & Environmental Services
Location
Johor , Malaysia
Scope Of Work
Investigation and analysis for the cause of river bank erosion of the effected areas
Formulate conceptual designs of river bank protections works deemed necessary to mitigate erosion problem
Detailed design of river bank protection works
Detailed design of all outlet structures and associated works
Detailed design of landscaping works and recreational facilities