MASS RAPID TRANSIT (MRT) PROJECT IN THE KLANG VALLEY : FROM SUNGAI BULOH - KAJANG
HSS was engaged as the Independent Consulting Engineer (ICE) for the MRT Line, seeing it through to the successful completion right up to the revenue service stage. In the first year, HSS’s 60-strong ICE team worked with the owner to create the project delivery strategy, the contracting structure and supporting agreements. HSS’s underground works expertise was applied to evaluate the pre-qualifications and tenders received, leading to the recommendation of the best tenderer to the client’s One Stop Procurement Committee. The ICE scope covered the pre-design and design stages, pre-construction, construction and tender stages.
The work was organised by discipline and covered infrastructure design and construction, rail systems design and implementation, interface management and contract and commercial agreements. Throughout the engagement HSS’s ICE team reviewed value engineering propositions, at the same time recommending industry best practice for modern MRT systems. For verification of payment to works package contractors, the ICE team regularly visited the sites to confirm both progress and compliance with the employers requirements. An important contribution by the ICE team was to prepare field observation reports with suggested solutions to correct observed problems.
Client
Mass Rapid Transit Corporation Sdn Bhd
Duration
2012 — 2017
Our Service
ICE & Engineering Design
Location
Selangor, Malaysia
Scope Of Work
Design of segmental box guides and diaphragm cracking
A girder support accident
Additional piled support to elevated guideway
Changes to platform edge columns in underground stations
Adjusting automatic assured receptivity units to improve regenerative breaking
Redesign of stringer fastening to improve safety
Benchmarking costs of comparable MRT systems globally