ASSOCIATED PROJECTS AT WESTPORTS
CONTAINER YARDS 4 – 7

HSS undertook civil / structural engineering design and supervision of the construction of Container Yard Nos 4 – 7 (refer also to the tabulation below setting out the implementation timing of various container terminals at Westports). The yards comprise stacking areas, container freight station buildings, workshops and other ancillary buildings and structures. HSS also prepared architectural designs for buildings, along with mechanical and electrical engineering design inputs.

01

Client

Klang Multi Terminal Sdn Bhd

03

Duration

2003 — 2014

02

Our Service

Engineering Design

04

Location

Selangor, Malaysia

Scope Of Work

Detail design

Project Management

Construction Supervision