In 1992, HSS’s first project at Port Klang was awarded by the Port Klang Authority prior to the privatisation. Phase II of Westport involving the construction of six general cargo/container berths each 200m in length and capable of providing for a maximum vessel size of 80,000 tonnes displacement. This concept arose out of the original master plan which had provision for five multi-purpose berths, 18 general cargo/container berths, four liquid bulk berths and four dry bulk berths. The Port Klang Authority engaged HSS in a joint venture to formulate the overall engineering master plan, as well as to undertake the project feasibility study (including economic evaluation of project options) and develop the port privatisation concept.