CORPORATE OFFICE AND FACTORY FOR SIDEL
To accommodate its rapid growth, SIDEL embarked on a project to construct a newfactory/office building. Situated on a 3.15 hectare site, the overall building measures 15,000 square metres and is specially designed to cater to all the special requirements of Sidel’s French standards for its plastic bottles manufacturing. HSS was appointed as a one stop consultant, responsible for overseeing implementation of the project on a ‘fast-track’ basis. Services covered the design and construction phases, through to handling over the completed project. Technical inputs covered civil/structural and mechanical/ electrical engineering, architecture and interior design.
Client
SIDEL Industry (M) Sdn Bhd
Duration
2005 — 2007
Our Service
Project Management
Location
Shah Alam, Selangor
Scope Of Work
Project Management
Civil & Structural Design
Bus Mechanical & Electrical
Construction Supervision
Architectural
Interior Design