CORPORATE OFFICE AND FACTORY FOR SIDEL

To accommodate its rapid growth, SIDEL embarked on a project to construct a newfactory/office building. Situated on a 3.15 hectare site, the overall building measures 15,000 square metres and is specially designed to cater to all the special requirements of Sidel’s French standards for its plastic bottles manufacturing. HSS was appointed as a one stop consultant, responsible for overseeing implementation of the project on a ‘fast-track’ basis. Services covered the design and construction phases, through to handling over the completed project. Technical inputs covered civil/structural and mechanical/ electrical engineering, architecture and interior design.

01

Client

SIDEL Industry (M) Sdn Bhd

03

Duration

2005 — 2007

02

Our Service

Project Management

04

Location

Shah Alam, Selangor

Scope Of Work

Project Management

Civil & Structural Design

Bus Mechanical & Electrical

Construction Supervision

Architectural

Interior Design

Picture6
deneme bonusu veren sitelerdeneme bonusubonus veren sitelerdeneme bonus siteleriporn
× How can I help you?