SULTANAH AMINAH HOSPITAL - REHABILITATION

This assignment carried out in association with Taywood Engineering Ltd, required the dimensional and condition survey of the building, involving reinforcement assessment using covermeter instruments and selective concrete breakouts to determine reinforcement configuration. Recommendations for repair methods included cathodic protection and implementation of inspection and maintenance programme.

01

Client

Jabatan Kerja Raya

(JKR)

03

Duration

1988 — 1994

02

Our Service

Engineering Design & Construction Supervision

04

Location

Johor, Malaysia

Scope Of Work

Dimensional and condition survey

Design analysis and overall assessment of structural integrity

Implementation of a complete inspection and maintenance programme

Construction Supervision

Picture2
× How can I help you?