STUDY, DESIGN IMPROVEMENT, CONSTRUCTION OPERATION AND MAINTENANCE OF IRRIGATION
NETWORK AND LINES AL ABDALLY FARMS
The farm areas around here were facing acute water shortage due to insufficient water quantity or low pressure. Contract SE-126 was initiated by the Ministry of Public Works to resolve the Poor Water Issues faced by the farmers in Abdally. HSS did the detailed engineering design of irrigation line, preparation of contract documentation and construction supervision for the project.