KANG KENG AIRPORT, CAMBODIA. PRELIMINARY DETAILED DESIGN-PHASE I
Ariston Sdn Bhd was awarded the USD 1.3 billion Sihanoukville Regional Development Project In Cambodia.
The project includes:
i) The development and construction of Cambodia`s second international airport
ii) The development of international casino and convention resort hotel complex at Naga Island and infrastructural facilities such as an independent power plant.
In a joint venture association with Sir William Halcrow and Partners (M) Ltd, we were appointed by Ariston Sdn Bhd to undertake the preliminary and detailed design of Phase 1 Development of Kang Keng Airport in Sihanoukville, Cambodia. Kang Keng Airport is situated to the east of Sihanoukville in a wide valley bounded by hills to the east and west
Client
Ariston Sdn Bhd
Duration
1996 - 1997
Our Service
Engineering Design
Location
Sihanoukville, Cambodia
Scope Of Work
Identification and preparation of all services required for topographical, geotechnical and condition survey.
Preparation of airport development layout plan
Preliminary and detailed engineering design for taxiway/apron to accommodate ATR 72 aircraft at present and Boeing aircraft in the future.
Terminal building area incorporating Cambodian architecture and all ancillary works.
Approach roads, carpark layout.
Infrastructure drawings for rainwater drainage, water supply and sewerage.
Mechanical and electrical services layout for the airport complex.