IMPROVEMENT WORKS FOR KUALA LUMPUR TO SEREMBAN EXPRESSWAY

The project, undertaken in two phases, involves the upgrading from a dual lane to 3-lane expressway from Sg. Bangi South Interchange for the first phase and widening of the existing formation to cater for 3 lanes plus hard shoulder from South Bangi Interchange to Seremban South Interchange for the second phase. The total project length is approximately 51km.

01

Client

PLUS Malaysia Berhad

(PLUS)

03

Duration

1990 - 1993

02

Our Service

Engineering Design & Construction Supervision

04

Location

Selangor & N. Sembilan

Scope Of Work

Topographic Survey

Pavement Condition Survey and Testing

Pavement Design

Highway Rehabilitation

Traffic Engineering

Geotechnical Investigation

Highway Structure Design

Service Relocation

Drainage Hydrology

Construction Supervision

Topographic Survey

Construction Costing