IMPROVEMENT WORKS FOR KUALA LUMPUR TO SEREMBAN EXPRESSWAY
The project, undertaken in two phases, involves the upgrading from a dual lane to 3-lane expressway from Sg. Bangi South Interchange for the first phase and widening of the existing formation to cater for 3 lanes plus hard shoulder from South Bangi Interchange to Seremban South Interchange for the second phase. The total project length is approximately 51km.
Client
PLUS Malaysia Berhad
(PLUS)
Duration
1990 - 1993
Our Service
Engineering Design & Construction Supervision
Location
Selangor & N. Sembilan
Scope Of Work
Topographic Survey
Pavement Condition Survey and Testing
Pavement Design
Highway Rehabilitation
Traffic Engineering
Geotechnical Investigation
Highway Structure Design
Service Relocation
Drainage Hydrology
Construction Supervision
Topographic Survey
Construction Costing