KTM ELECTRIFIED DOUBLE TRACKING – GEMAS TO KLUANG

HSS was engaged to undertake the implementation of the electrified double tracking and upgrading of the railway infrastructure, including signaling and communications, between Gemas and Kluang. The upgrading is designed to increase the speed, frequency and capacity of the train services whilst enhancing operation safety of both passenger and freight trains.

HSS prepared the detailed engineering designs for 109km of double track alignment and yards, 10 river bridges, 30 road-over-railway bridges, 5 station yards and 3 halts.

01

Client

Gamuda Engineering Sdn Bhd

03

Duration

2003 - 2010

02

Our Service

Engineering Design & Construction Supervision

04

Location

Gemas to Kluang

Scope Of Work

109km of double track alignment and yards

18 nos. of river bridges (total span 0.8km)

30 nos. of road over railway bridges (total span 1.5km)

5 nos. station yards and 3 nos. halts