DUTA – ULU KELANG EXPRESSWAY (DUKE)

We were involved in the detailed design and construction supervision of 18 km of Urban Expressway comprising two segments between :

  • Jln Duta Interchange ( at the meeting point of SPRINT and NKVE at Jln Duta ) and the Hill View Interchange MRR II at Ampang (12km)
  • Sentul Pasar Interchange and the Greenwood Interchange ( 6 km Karak Link )

The services provided involved the preliminary design of 7 interchanges and ramps, 1.5km of elevated viaduct, 15 road underbridges and overbridges, 3km of RE Walls with piled embankments, 3 Toll Plazas. Subsequent scope was the detailed design of section 3 (Sentul Pasar Interchange to Greenwood Interchange)

01

Client

Ekovest Construction

Sdn Bhd

03

Duration

2001 - 2007

02

Our Service

Engineering Design & Construction Supervision

04

Location

Kuala Lumpur, Malaysia

Scope Of Work

Preliminary Design Stage

Soil Investigation

Topographical Surveys

Preliminary Engineering Designs

Submission Of Technical Proposal and Preliminary Costings

Preparation Of Technical Appendices To Concession Agreement

Detailed Design and Construction Stage

Geometric and Pavement Design

Services relocation, streetlighting

Drainage & vehicular box culverts

Ground treatment

Bridges & retaining works

Road junction & road marking

Road junction & road marking