DUTA – ULU KELANG EXPRESSWAY (DUKE)
We were involved in the detailed design and construction supervision of 18 km of Urban Expressway comprising two segments between :
- Jln Duta Interchange ( at the meeting point of SPRINT and NKVE at Jln Duta ) and the Hill View Interchange MRR II at Ampang (12km)
- Sentul Pasar Interchange and the Greenwood Interchange ( 6 km Karak Link )
The services provided involved the preliminary design of 7 interchanges and ramps, 1.5km of elevated viaduct, 15 road underbridges and overbridges, 3km of RE Walls with piled embankments, 3 Toll Plazas. Subsequent scope was the detailed design of section 3 (Sentul Pasar Interchange to Greenwood Interchange)