VIADUCT TO PUTRAJAYA BRIDGE ON NORTH–SOUTH EXPRESSWAY CENTRAL LINK

Viaduct to the Putrajaya Bridge included performing detailed investigations, visual inspections (ie according to REAM-GL 5/2004 guidelines), together with on-site supervision and testing. HSS was engaged to undertake bridge inspection works, instrumentation and monitoring works.

01

Client

PLUS Berhad

03

Duration

2014 — 2015

02

Our Service

Construction Supervision

04

Location

Putrajaya,Malaysia

Scope Of Work

Stage 1A - Visual Inspection as per REAM-GL 5/2004 Guidelines

Stage 1B - Detailed Investigation with Details Supervision on any Testing Works along with Instrumentation and Monitoring Including Supervision.