VIADUCT TO PUTRAJAYA BRIDGE ON NORTH–SOUTH EXPRESSWAY CENTRAL LINK
Viaduct to the Putrajaya Bridge included performing detailed investigations, visual inspections (ie according to REAM-GL 5/2004 guidelines), together with on-site supervision and testing. HSS was engaged to undertake bridge inspection works, instrumentation and monitoring works.
Client
PLUS Berhad
Duration
2014 — 2015
Our Service
Construction Supervision
Location
Putrajaya,Malaysia
Scope Of Work
Stage 1A - Visual Inspection as per REAM-GL 5/2004 Guidelines
Stage 1B - Detailed Investigation with Details Supervision on any Testing Works along with Instrumentation and Monitoring Including Supervision.