RECTIFICATION OF FIRE DAMAGE TO PENANG BRIDGE

HSS was commissioned to undertake a detailed assessment of an 80m section of the Penang Bridge which was damaged by a 5-hour long fire on 11 September 2010. HSS was engaged to investigate and design and implement rectification works in four stages.

01

Client

Penang Bridge Sdn Bhd (PBSB)

03

Duration

2010 — 2011

02

Our Service

Construction Supervision

04

Location

Penang.Malaysia

Scope Of Work

Stage 1 – Involves an initial Site visit to review the structure and identification of the proposed approach to investigation and pelographic testing needs.

Stage 2 – Involves the actual on site works and review of Test results and submission of a preliminary report.

Stage 3 – Involves a detailed Structural Assessment and the development of the Remedial Recommendations using CFRP.

Stage 4 – Involves Supervision during Remedial Works.