MUAR-MELAKA RAW WATER TRANSFER PROJECT

SMHB was Consultant for the construction of a pumped transfer of 110 Mld raw water from Muar to Melaka from 1991 to 1993 implemented on Design and Build contract by JKR and Perbadanan Air Melaka.

In 2002, Perbadanan Air Melaka appointed SMHB to carry out detail design and construction supervision for the Muar-Melaka Raw Water Transfer Scheme Extension to increase the transfer capacity following a water crisis in the state.

01

Client

Perbadanan Air Melaka

03

Duration

2002 to 2003

02

Our Role

Detail design

04

Location

Johor, Melaka

Scope Of Work

Preparation of tender documents

Detail design

Tender evaluation

Construction supervision

deneme bonusu veren sitelerdeneme bonusubonus veren sitelerdeneme bonus siteleriporn
× How can I help you?