MUAR-MELAKA RAW WATER TRANSFER PROJECT
SMHB was Consultant for the construction of a pumped transfer of 110 Mld raw water from Muar to Melaka from 1991 to 1993 implemented on Design and Build contract by JKR and Perbadanan Air Melaka.
In 2002, Perbadanan Air Melaka appointed SMHB to carry out detail design and construction supervision for the Muar-Melaka Raw Water Transfer Scheme Extension to increase the transfer capacity following a water crisis in the state.
Client
Perbadanan Air Melaka
Duration
2002 to 2003
Our Role
Detail design
Location
Johor, Melaka
Scope Of Work
Preparation of tender documents
Detail design
Tender evaluation
Construction supervision

