CONSTRUCTION OF THE BALANCE OF PLANT (BOP) FOR THE 1000MW COAL FIRED POWER PLANT EXTENSION
The Power Plant is located approximately 10 km south of Lumut town and accessible by road only. The project consists of the design and construction of a 1000MW coal fired power plant for Tenaga Nasional Berhad. Alstom and China National Machinery Import & Export Corporation (CMC) is the design and build specialist contractor for the project. Mudajaya Corporation Berhad had appointed us as their Geotechnical, Civil, Structural and Mechanical and Electrical Engineering Consultant for the Balance of Plant (BOP).