CONSTRUCTION OF THE BALANCE OF PLANT (BOP) FOR THE 1000MW COAL FIRED POWER PLANT EXTENSION

The Power Plant is located approximately 10 km south of Lumut town and accessible by road only.  The project consists of the design and construction of a 1000MW coal fired power plant for Tenaga Nasional Berhad. Alstom and China National Machinery Import & Export Corporation (CMC) is the design and build  specialist contractor for the project. Mudajaya Corporation Berhad had appointed us as their Geotechnical, Civil, Structural and Mechanical and Electrical Engineering Consultant for the Balance of Plant (BOP).

01

Client

Mudajaya Corporation Berhad

03

Duration

2011 — 2013

02

Our Service

Engineering Design & M&E

04

Location

Perak, Malaysia

Scope Of Work

Geotechnical

Civil & Structural

Mechanical & Electrical

Building MEP Services for the project