KUALA LUMPUR THERMAL SOLID WASTE TREATMENT PLANT

The thermal solid waste treatment plant, or incinerator, with a capacity of 1,200 tonnes/day of municipal solid waste from the south-western areas of Kuala Lumpur, is located on a eight hectare site. The plant utilises the state-of-the-art gasification and ash melting technology, designed to reduce total dioxin generation and emission of heavy metals and enable glass, aluminium and steel to be recovered. Also, the heat produced by the plant is used to generate electricity at comparatively high efficiency. HSS was appointed as part of a consortium to undertake the project management consultant role and in doing so ensure that the  plan t is planned, designed, constructed, commissioned and operated in conformance with both international standards and local conditions. This project was deferred by the government in 2006.

01

Client

Ministry of Housing & Local Government

03

Duration

2001 — 2006

02

Our Service

Project Management Concultancy

04

Location

Kuala Lumpur, Malaysia

Scope Of Work

The Ministry of Housing and Local Government appointed Yachiyo Engineering Co Ltd in association with us and other two companies - Minco Sdn Bhd and EEC Sdn Bhd as Project Management Consultants for the first of its kind Thermal Waste Treatment Plant project in Malaysia. The role of the PMC is to assist the GOM to ensure that the Project is planned, designed, constructed, commissioned and operated in conformance with international standards and is sensitive to local conditions.

Picture3
deneme bonusu veren sitelerpornpornporn
× How can I help you?