AMPANG PECAH TO BUKIT RASAH ROAD

The Ampang Pecah to Bukit Rasah Road was HSS’s first road project back when it was a newly formed company. HSS was appointed to design seven kilometres of JKR R3 Standard Highway, including four pre-stressed post-tensioned bridges, ranging from single-span to three-span. Each span had pre-cast beams and an in-situ slab. The abutments were comprised of reinforced concrete bank seats, with wing walls, supported on bored piles. Span configurations ranged from 22m to 42m.

The Ampang Pecah to Bukit Rasah Road was HSS’s first road project back when it was a newly formed company. HSS was appointed to design seven kilometres of JKR R3 Standard Highway, including four pre-stressed post-tensioned bridges, ranging from single-span to three-span. Each span had pre-cast beams and an in-situ slab. The abutments were comprised of reinforced concrete bank seats, with wing walls, supported on bored piles. Span configurations ranged from 22m to 42m.

The services provided by HSS covered highway design, topo-graphical survey. geotechnical investigations, bridge structural analysis/design and preparation of engineering drawings.

 

01

Client

Jabatan Kerja Raya, Selangor

03

Duration

1985 — 1986

02

Our Service

Engineering Design

04

Location

Selangor, Malaysia

Scope Of Work

Highway Design

Engineering and Topographical Survey

Soil and Geotechnical Investigation

Bridge Structural Design and Analysis

Picture2